110 Benntek Wheel Alignment Machine Installation Requirementsútgáfutími:2026-05-26 11:14
Site and space prerequisites Precise floor flatness and level tolerances (consult OEM — often within mm tolerances across runways) Clear approach lanes for drive-on racks and adequate exit clearance for vehicle flow Space for workstation, monitor, and printer with ergonomic placement for technician Structural and floor requirements Concrete slab strength and reinforcement needs depending on the alignment rack weight Pit or surface mount choices — pits reduce ramp length and vehicle lift stroke, surface mounts are easier to install Proper mounting anchor plans and torque specs for anchor bolts Utilities and infrastructure Dedicated electrical circuits per machine spec (single vs three-phase) and surge protection Compressed air routing for pneumatic fixtures or turntables if used Network connectivity for software updates, cloud features and remote diagnostics Environmental & lighting controls Stable, vibration-free camera mounts and minimal reflective glare in camera fields Consistent ambient lighting to avoid false readings on optical systems Temperature control to maintain measurement stability Installation timeline and process Pre-install site survey and foundation recommendation by Benntek specialists Professional installation including leveling, cabling, initial calibration and test vehicles Technician handover training and first-week follow-up calibration check Documentation and compliance Keep installation and calibration certificates for warranty and insurance purposes Maintain alignment system logs to demonstrate periodic calibration and service Schedule a site survey and installation estimate with Benntek at marketing@eounice.com
|